Project Scenario for Project 1: Previously, the CEO told you about the breach at a rival company and his concerns for security

Project Scenario for Project 1:

Previously, the CEO told you about the breach at a rival company and his concerns for security at Mercury USA. In light of these developments, Mercury USA has decided to conduct vulnerability assessments. An outside firm has conducted penetration tests on Mercury’s systems and provided the reports. Now, it is up to you as the cyber threat analyst to look at those reports, apply them to the specific company setup and business needs, and recommend changes.

Mercury USA’s concerns:

· protecting customer information 

· protecting proprietary business data

· protecting dangerous loads/hazardous materials during transportation  

Before you came onboard, a third-party penetration tester was brought in to assess Mercury USA’s security posture and network. One of the findings from the pen test report was the realization that an important part of a VM process is a vulnerability scanner. The pen tester provided a scan report using the free tool Open Vulnerability Assessment Scanner (OpenVAS). Judy has provided you with the OpenVAS report for your initial analysis.

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Operational Excellence Week 2 Assignmentinformation

Operational Excellence Week 2 Assignment information Systems for Business and Beyond Questions · Chapter 2 – study questions 1-10, Exercise 2      Information Technology and Organizational Learning Questions · Chapter 2 – Note why the IT organizational structure is an important concept to understand.  Also, note the role of

Pg. 01Project I ProjectDeadline: Sunday 12/5/2024 @ 23:59[Total

Pg. 01 Project I Project Deadline: Sunday 12/5/2024 @ 23:59 [Total Mark is 14] Introduction to Database IT244 College of Computing and Informatics Project Instructions · You can work on this project as a group (minimum 2 and maximum 3 students). Each group member must submit the project individually with