Assignment 3: Change Management Project Presentation  (20 Points)Instructions:This assignment is the culmination of the proposal formulation for

Assignment 3: Change Management Project Presentation  (20 Points)

Instructions:

This assignment is the culmination of the proposal formulation for the change management plan. As the change management team, you are invited to present the designed change project to the top-level leadership team of the organization. This first step is essential for gaining their approval and further support. You have to put together the information discussed on assignment 2 and design the essential actions for achieving the expected results. 

Further instructions:
• A minimum of seven (7) current scholarly references (other than the course textbooks). You may draw upon all of the resources used in the course, in addition to others which you have found useful.
• For this in-class presentation, students must have a Power Point Presentation (voice-over) that clearly articulates and showcases the change management plan. Voice-over does not mean “read word-for-word” from the slides. You are to present your information and the slides are there to visually assist your readers.
• Ensure that presentation slides are clear and concise and are within 15 slides.

Content and Structure of the assignment:

• A definition of change management, and its relevance in the organizational behavior field.
• Discuss the role of the change management committee and introduce its members (group members).
• An introduction of the organization with a brief profile (i.e., the field of operations, vision, and mission); analysis of the organization’s change pattern i.e., open for innovation; change culture/mindset or avoidance or not supportive of change. Note: For privacy issues use a pseudonym to replace the actual name.
• Explain the focus/objective of the change project and the urgency for addressing it.
• Discuss the change model selected to support/guide the change project
• Discuss the essential actions of the change plan as per the selected change model, which should consider addressing potential resistors.
• Discuss a communication plan.
• The reference list.


Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

 Every battle in

 Every battle in <a href=” stars</a> is thrilling and competitive because the game perfectly mixes talent and strategy.  To succeed, players need to be masters of both shooting and defense, and they need to be able to out-plan their opponents.  The game’s fast-paced action makes it fun for both recreational

Instructions attached Feedback from last year attached Project plan attachedYour project framework should be clearly defined and include

Instructions attached  Feedback from last year attached  Project plan attached Your project framework should be clearly defined and include population, foundations, phenomena, and variables. The framework consists of three elements: ● Methodological Approach. ○ Describe the proposedmethodological framework that aligns the topic, problem, gap, and project questions. ● Population and

2NURS 112 ClinicalValerie tidoe Lexi Hought

2 NURS 112 Clinical Valerie tidoe Lexi Hought 2/24/25 NURS 112 Clinical Discuss the nutritional needs of your resident. 1. Are they on a therapeutic diet? If so, why? The resident’s dietary requirements are essential to maintaining his health and avoiding complications. The resident’s BMI is 34.3, and he falls