The Casual Furniture Company The Casual Furniture Company (CFC) makes a variety of bookshelves for homes and businesses. The shelves come in various

The Casual Furniture Company

The Casual Furniture Company (CFC) makes a variety of bookshelves for homes and businesses. The shelves come in various heights, widths, materials, and finishes. Effective requirements planning is essential for CFC’s performance, and it uses MRP for planning.

The MPS and MRP records are shown for one of CFC’s products, part number 4 × 3-01, a four-foot-high and three-foot-wide standard depth oak bookshelf. The BOM as a product structure diagram is shown in Figure 14-19.

FIGURE 14-19 Bookshelf 4 × 3-01 BOM

CFC uses one-week time buckets and a planning horizon of eight weeks. The MPS for the 4 × 3-01 Bookshelf is shown in Figure 14-20.

FIGURE 14-20 MPS Bookshelf 4 × 3-01

Table Summary: Summary

The cabinets are built in the cabinet assembly department and the shelves, backs, sides, and ends are made in the cutting department. The component lot size, lead time, available inventory and safety stock are shown in Figure 14-21. Two associates work in the cutting department, making the available capacity 80 hours per week, without overtime. The processing time for each component in the cutting department is shown in Figure 14-22. Also note that there is a scheduled receipt of 600 brackets in week 1 and a scheduled receipt of 1000 oak sheets in week 1.

FIGURE 14-21 Component Lot Size and Inventory Information

FIGURE 14-22 Cutting Department Processing Time


Questions

1) Develop the MRP for all of the components.

2) During week 1 of the plan, the bracket supplier notifies CFC that the order for 600 units will not arrive as planned. Instead, 300 will arrive this week and 300 will arrive next week, instead of all 600 arriving at the same time. Will this affect production and, if so, to what extent?

3) Now that the plan has been developed, is it feasible to consider the capacity of the cutting department? What recommendations do you have?

4) If you could change the lead times or lot-sizing policies used for any of the components, what changes would you make? Why?

THIS SHOULD BE BASED ON BOOK: Managing Operations Across the Supply Chain BY Morgan Swink. PLEASE ONLY USE THIS BOOK AS YOUR GUIDE (CHAPTER 14)

Please review the transcript attached and use the insights from there to answer all these questions thoroughly. Also, please use the excel sheet to aid with answering (fill in all the information needed).

image1.png

image2.png

image3.png

image4.png

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

please understand the concept before accepting my bidI’m looking for someone with a background in supply chain management, business analytics, or

please understand the concept before accepting my bid I’m looking for someone with a background in supply chain management, business analytics, or operations management who is proficient in using Excel for forecasting analysis. I need help completing an assignment that involves calculating forecast accuracy metrics — including Forecast Error, Forecast

Assistance with power point BUSI 601 Learning Project: Plan for Implementation Presentation Assignment Instructions

Assistance with power point  BUSI 601 Learning Project: Plan for Implementation Presentation Assignment Instructions Using the organization selected in the Learning Project: Contemporary Management Techniques Research Paper Assignment, prepare a PowerPoint presentation and Kaltura video outlining the plan for implementation. The PowerPoint slides should include a detailed plan of how

  The construction industry in Bangladesh is on a boom and it needs construction chemicals manufacturer for reliable and good quality construction

  The construction industry in Bangladesh is on a boom and it needs construction chemicals manufacturer for reliable and good quality construction chemicals. Ducon Construction Chemicals Industries Ltd is paving the way for the ultimate value in stronger foundations, leak-proof rooftops and glossy, long-lasting flooring. People involved in construction often