Due: Sunday, 11:59 p.m. EST of Unit 5Points: 100Overview:In this assignment, you will produce a change management plan. Performing

Due: Sunday, 11:59 p.m. EST of Unit 5

Points: 100

Overview:

In this assignment, you will produce a change management plan. Performing integrated
change control is an important process of the project integration management. In a
project, there will always be change requests. These changes will be evaluated by the
change control board. Afterward, if the change requests are approved, they will be
implemented. The changes in a project are accepted, rejected or handled in the Perform
Integrated Change control process. From submission of a change request until its
implementation and closure, performing the integrated change control process ensures
the successful change management in a project.

Instructions:

Your project scope has been increased by 5% of the original plan, impacting your
schedule and costs. Using the change management plan Word template, create a
change management plan reflecting the 5% increase in scope.

Remember that you’re using a template, so some areas may not applicable given the
nature of your project.

Be sure to read the criteria, by which your assignment will be evaluated,

before you write, and again after you write.

PMG699 – Capstone

Unit 5 Assignment: Integrated Change Control

Evaluation Rubric for Unit 5 Assignment

CRITERIA Deficient

Needs

Improvement

Proficient

Exemplary

0-23 points 24-31 points 32-39 points 40 points

Change

Management Plan:

Impact on the

Schedule

The change

management plan

is not substantial

and does not

include activities

and estimated

durations.

The change

management plan

is not detailedon the

impact on the

schedule, contains

change request

processes, change

management log

and change control

board processes

The change

management plan

is detailed on the

schedule and

contains change

request processes,

change

management log

and change control

board processes,

but is not

comprehensive.

The change

management plan

is detailed and

comprehensive on

the impact on the

schedule and

contains change

request processes,

change

management log

and change control

board processes.

0-26 points 27-35 points 36-44 points 45 points

Change

Management Plan:

Impact on Costs

The change

management plan

is not substantial on

the impact on costs

and does not

include

contingencies

The change

management plan

is not detailed on

the impact on costs,

change request

processes, change

management log,

and change control

board processes.

The change

management plan

is detailed on the

impact on costs,

change request

processes, change

management log,

and change control

board processes,

but is not

comprehensive

The change

management plan

is detailed and

comprehensive on

the impact on costs,

change request

processes, change

management log,

and change control

board processes.

0-8 points 9-11 points 12-14 points 15 points

Clear and

Professional

Writing and APA

Format

Errors impede

professional

presentation;

guidelines not

followed.

Significant errors

that do not impede

professional

presentation.

Few errors that do

not impede

professional

presentation.

Writing and format

are clear,

professional, APA

compliant, and error

free.

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Need soonRequired Readings & ResourcesAmerican Counseling Association. (2014). 2014 ACA code ofethics.● Section F: “Supervision, Training,

Need soon Required Readings & Resources American Counseling Association. (2014). 2014 ACA code of ethics. ● Section F: “Supervision, Training, and Teaching” American Association for Marriage and Family Therapy. (2012). AAMFT code of ethics. National Association for Alcoholism and Drug Abuse Counselors. (2021). NAADAC code of ethics. The Importance of

Week 12 Positive Communication in Relationships Take a few minutes to watch the following video clip and refer to Chapter7. Watch Videoblack-ish

Week 12 Positive Communication in Relationships Take a few minutes to watch the following video clip and refer to Chapter7.  Watch Videoblack-ish Sneak Peek from “Big Night, Big Fight”Duration: 1:24  User: n/a –  Added: 2/8/15YouTube URL:  black-ish Sneak Peek from “Big Night, Big Fight”Links to an external site. Answer the following questions:  A

 Even though certain non-verbal signals have been associated with courtship and romantic flirtation, we also know that similar behaviors occur when

 Even though certain non-verbal signals have been associated with courtship and romantic flirtation, we also know that similar behaviors occur when people are trying to communicate friendliness, interest, and playfulness. These quasi-courtship behaviors can lead to misunderstandings, and they remind us how important context is for interpreting nonverbal signals. The

see attached instructions1 Argumentative Essay Instructions Write an

see attached instructions 1 Argumentative Essay Instructions Write an Argumentative essay of no fewer than 500 words (not including the References) on one of the topics from the list provided below: I- Type of essay: Argumentative II-Select one of the following topics: 1. Cigarette Smoking Should Be Banned. 2. Should

please see attachment1

please see attachment 1 4 Brainstorming Activity 1A. List the primary objection opponents might make to your thesis’ claim: Critics argue that correct academic standards for student-athletes mean that athletic talents and athletes with low GPA scores will not be allowed to flaunt their talents. This could particularly affect underprivileged