Due: Sunday, 11:59 p.m. EST of Unit 5Points: 100Overview:In this assignment, you will produce a change management plan. Performing

Due: Sunday, 11:59 p.m. EST of Unit 5

Points: 100

Overview:

In this assignment, you will produce a change management plan. Performing integrated
change control is an important process of the project integration management. In a
project, there will always be change requests. These changes will be evaluated by the
change control board. Afterward, if the change requests are approved, they will be
implemented. The changes in a project are accepted, rejected or handled in the Perform
Integrated Change control process. From submission of a change request until its
implementation and closure, performing the integrated change control process ensures
the successful change management in a project.

Instructions:

Your project scope has been increased by 5% of the original plan, impacting your
schedule and costs. Using the change management plan Word template, create a
change management plan reflecting the 5% increase in scope.

Remember that you’re using a template, so some areas may not applicable given the
nature of your project.

Be sure to read the criteria, by which your assignment will be evaluated,

before you write, and again after you write.

PMG699 – Capstone

Unit 5 Assignment: Integrated Change Control

Evaluation Rubric for Unit 5 Assignment

CRITERIA Deficient

Needs

Improvement

Proficient

Exemplary

0-23 points 24-31 points 32-39 points 40 points

Change

Management Plan:

Impact on the

Schedule

The change

management plan

is not substantial

and does not

include activities

and estimated

durations.

The change

management plan

is not detailedon the

impact on the

schedule, contains

change request

processes, change

management log

and change control

board processes

The change

management plan

is detailed on the

schedule and

contains change

request processes,

change

management log

and change control

board processes,

but is not

comprehensive.

The change

management plan

is detailed and

comprehensive on

the impact on the

schedule and

contains change

request processes,

change

management log

and change control

board processes.

0-26 points 27-35 points 36-44 points 45 points

Change

Management Plan:

Impact on Costs

The change

management plan

is not substantial on

the impact on costs

and does not

include

contingencies

The change

management plan

is not detailed on

the impact on costs,

change request

processes, change

management log,

and change control

board processes.

The change

management plan

is detailed on the

impact on costs,

change request

processes, change

management log,

and change control

board processes,

but is not

comprehensive

The change

management plan

is detailed and

comprehensive on

the impact on costs,

change request

processes, change

management log,

and change control

board processes.

0-8 points 9-11 points 12-14 points 15 points

Clear and

Professional

Writing and APA

Format

Errors impede

professional

presentation;

guidelines not

followed.

Significant errors

that do not impede

professional

presentation.

Few errors that do

not impede

professional

presentation.

Writing and format

are clear,

professional, APA

compliant, and error

free.

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

 Discuss the classification of reverse logistics components and definitions of reverse logistics components in the reading. The types or processes

 Discuss the classification of reverse logistics components and definitions of reverse logistics components in the reading. The types or processes listed and the descriptions in the textbook provide insight. Paraphrase, and cite/reference material from the class reading and library articles (for elaborating in the participating posts). Consider the components the

 Course Project 2Tesla CompanyIsdory Lyamuya DeVry University BUSN412 Professor: Jasmine McKinney February 8, 2025

 Course Project  2 Tesla Company Isdory Lyamuya DeVry University BUSN412 Professor: Jasmine McKinney February 8, 2025 Porter’s Generic Strategies Porter’s Generic Strategies help Tesla secure and maintain a competitive position throughout the electric vehicle (EV) sector. Tesla implements a differentiation strategy through its advanced EVs that combine exceptional performance capabilities,

Need Liife Rewound Project: Character Timeline Create a detailed timeline or storyboard showcasing the key moments in the character’slife

Need  Liife Rewound Project: Character Timeline Create a detailed timeline or storyboard showcasing the key moments in the character’s life journey, working backward from their death to their birth. Each stage of the character’s life will be visually represented, accompanied by annotations or descriptions highlighting important events and developmental milestones.

Policy Analysis Section 4- Final Draft (100 points)

Policy Analysis Section 4- Final Draft (100 points) PH 528 Introduction: State Senator Hob Bryan (Mississippi District 7) is the chairman of the Mississippi State Senate Public Health and Welfare Committee. Now that the state legislature has passed a bill legalizing medical marijuana use in the state, members of the

Assignment #5PH 528Directions: Read the “Incarceration

Assignment #5 PH 528 Directions: Read the “Incarceration Case Study”, which outlines policy efforts to address public health in prisons and among incarcerated populations. Respond to the following questions, with each response a minimum of 150 words. Due Date: Upload your assignment to Blackboard as a .doc or .docx file